Skip to main content

Changes to Step #2

Edit by iRobot

Edit approved by iRobot

Before
After
Unchanged

Step Lines

-[* red] Lift up on the connector gate with a pair of precision tweezers, which clamps down on the end of the ribbon cable.
+[* red] Lift up on the connector gate with a pair of precision [product|IF145-020|tweezers], which clamps down on the end of the ribbon cable.
[* icon_note] In the second picture, the foam is pulled back for clarity.
[* orange] With the pair of tweezers, firmly clamp down on the ribbon cable, and pull it away from the connector gate.