Changes to Step #1
Edit by Tiny Machines 3D —
Edit approved by Tiny Machines 3D
- Before
- After
- Unchanged
Step Lines
[title] Preparing / Cleaning | |
+ | [* icon_note] Position the Z Axis about 250mm (halfway up) above the bed |
+ | [* icon_note] Remove filament spool and set aside |
[* icon_caution] Power Off, Power Cables UNPLUGGED | |
+ | [* icon_note] Remove printhead cable and control box and set aside. |
+ | [* icon_reminder] You will need to be able to access the back of the machine as well as the front. Give yourself enough room to rotate the machine. |
+ | [* icon_note] If you have access to compressed air, blow the machine off. Use this time to clean the machine and give yourself good lighting to look over all the components on the machine. |